Tuesday, January 25, 2011

And So It Begins...

Operation Our Bathrooms Need a Major Overhaul


In my bestest most creepiest Count voice: That's one, two, three, ahahahahaha toilets.

We're right smack dap in the very middle of destroying beautifying our bathrooms.

What's left to do in the half bathroom:
Swap out drain trap for sink
Install brand new toilet that flushes!
Tile floor
Install new baseboards

What's left to do in the guest bathroom:
Wait for tub valve part to arrive and finish installing
Install brand new toilet that flushes!
Tile floor
Install new baseboards
Paint stripes on wall

What's left to do in the master bathroom:
Everything! Ugh.

I'll post some before pictures of the master bathroom at some point.  

2 comments:

  1. Just confirming, the master bedroom toilet that you currently have flushes, right?

    ReplyDelete
  2. Technically all 3 toilets flush. They just really, really suck at it.

    ReplyDelete